FIRST UNLOAD OF CLINKER
Miércoles, 26 de Septiembre de 2018 - 04:59 h
UNLOAD THE FIRST SHIP OF CLINKER.  Was unloaded on 13/10/2008 at the Dársena Sur in the Port of Castellón , the first boat of Clinker  ELITE CEMENTOS, for the next production of cement Portland.
 
[need adoble flash player]